Colour Cut

Lettering & simple logos onto a wide range including sportswear and jackets with no minimum order and a fast turnaround.... more»

Images will sit directly on the shirt fabric with no background and have excellent washabaility.

The process is not suitable for logos with lots of colours, photographs, detailed images, fine lines or large amounts of text.

Lead time is usually around 4 or 5 days although a same day or next day service is sometimes available.

See below for our standard print colours (please note these are only as accurate as the web process allows).

 

Screenprinting

Larger quantities and complex designs (minimum order of twenty)... more»

We use screen printed transfers which give excellent washability and enable fine detail and sharp lines.  The image sits directly on the shirt fabric with no background although a thin border is sometimes needed for multicolour prints.

A screen needs to be made up for each print colour making it more expensive for multicolour prints.

There is minimum order of twenty items needed and lead time is around two weeks.

Pantone colours can usually be matched fairly closely this way making it an excellent choice for corporate and club clothing.

DTF

Using the latest technology for vibrant colours and excellent durability whilst eliminating much of the waste associated with more traditional methods.... more»

No border or background is needed but we can’t always match pantone references with this process.

Prices will vary according to the size of the print area.

Lead time is usually around ten days although a faster service is sometimes available

Direct to Garment

Full colour large images onto high cotton content garments (minimum order of ten)... more»

 

The print is hardwearing and sits directly on the shirt with no background behind. Images have a lovely soft feel and large print area but the colours are not as strong as some other processes.

This process works best on T-shirts due to the high cotton content.

There is minimum order of ten items needed and lead time is usually two to three weeks

 

Embroidery

We no longer offer an embroidery service.    ... more»

We no longer offer an embroidery service.